PROJECTS

Le Auria

Le Auria

Demolition of an existing building, and construction of 72 rental units on 7 floors with 3 underground parking levels.

Details
Le Aryia

Le Aryia

Demolition of an existing commercial building, decontamination and construction of 125 rental units on 8 floors with 2 underground parking levels.

Details
MQP

MQP

Construction of a three story residential apartment building with one level of underground parking.

Details
Le Must

Le Must

Construction of two six story residential apartment buildings with a shared two level underground parking structure.

Details
Quartier One West Phase I

Quartier One West Phase I

Construction of a 6 story residential apartment building with 120 units and one level of underground parking. This phase is being built on a land that will house a total of 4 buildings with a total of 400 units.

Details
L82

L82

Demolition of an industrial building in the heart of griffintown followed by the construction of a residential building comprising of commercial space and 82 rental units distributed on 8 floors plus 2 levels of underground parking.

Details
Condo Orizon Ph.3

Condo Orizon Ph.3

Demolition of an industrial building followed by the construction of a residential building comprising a total of 40 condos distributed on 7 floors plus 2 levels of underground parking.

Details